The Illinois DOT said fixing the bridge will take time, as they want to repair the damage without erasing a multi-generational symbol for the area.
About the author
Related Posts
Galesburg updating its airport master plan
March 21, 2025
The Illinois DOT said fixing the bridge will take time, as they want to repair the damage without erasing a multi-generational symbol for the area.